Rydzewska house

Energy data

Heating 50

kWh/(m²year)

Heating demand

Amount of heat that must be supplied throughout the year to ensure the comfort conditions established by the regulations

Cooling 50

kWh/(m²year)

Dehumidification and cooling demand

Amount of heat that must be extracted throughout the year to ensure the comfort conditions established by the regulations

Airtightness 10

1/hour

Thermal envelope airtightness

Number of indoor air changes that occur every hour, under an indoor-outdoor pressure difference of 50 Pascals

Energy 200

kWh/(m²year)

Primary Renewable Energy (PER) demand

Wind, solar, aerothermal, geothermal, hydrothermal, hydro, biomes and non-fossil gases

Saving 0

€/year

Estimated annual heating, cooling, and dehumidification savings

Comparing with an identical building that complies with the Spanish Technical Building Code (CTE-2013), with half the performance of its equipment and an energy price of €0.40/kWh

Construction year

2020

Location

Guriezo, Cantabria. SPAIN

Architects

Fernando Sanhipolito

Collaborators

Laura Salinas

Photographs

Kurt Pichler / Sanhipolito

Builder

Roseland Passivhaus

Energy Reference Surface

102 m²

Construction cost (excluding VAT)

Data not available

Energy certifications

Passive House Classic (in process)

Construction process