Red Door House
Energy data
kWh/(m²year)
Amount of heat that must be supplied throughout the year to ensure the comfort conditions established by the regulations
kWh/(m²year)
Amount of heat that must be extracted throughout the year to ensure the comfort conditions established by the regulations
1/hour
Number of indoor air changes that occur every hour, under an indoor-outdoor pressure difference of 50 Pascals
kWh/(m²year)
Nuclear or from fossil fuels (oil, natural gas and coal, fundamentally)
€/year
Comparing with an identical building that complies with the Spanish Technical Building Code (CTE-2013), with half the performance of its equipment and an energy price of €0.40/kWh
Construction year
2018
Location
Guriezo, Cantabria. SPAIN
Architects
Fernando Sanhipolito
Collaborators
Laura Salinas
Photographs
Kurt Pichler / Sanhipolito
Builder
Roseland Passivhaus
Energy Reference Surface
181 m²
Construction cost (excluding VAT)
Data not available
Energy certifications
Passive House Classic