BMV house
Energy data
Heating
50
kWh/(m²year)
Heating demand
Amount of heat that must be supplied throughout the year to ensure the comfort conditions established by the regulations
Cooling
50
kWh/(m²year)
Dehumidification and cooling demand
Amount of heat that must be extracted throughout the year to ensure the comfort conditions established by the regulations
Airtightness
10
1/hour
Thermal envelope airtightness
Number of indoor air changes that occur every hour, under an indoor-outdoor pressure difference of 50 Pascals
Energy
200
kWh/(m²year)
Non-renewable Primary Energy (EP) demand
Nuclear or from fossil fuels (oil, natural gas and coal, fundamentally)
Saving
0
€/year
Estimated annual heating, cooling, and dehumidification savings
Comparing with an identical building that complies with the Spanish Technical Building Code (CTE-2013), with half the performance of its equipment and an energy price of €0.40/kWh
Construction year
2021
Location
Becerril de la Sierra, Madrid. SPAIN
Architects
Fernando Sanhipolito
Collaborators
Alba Sánchez / Isaura Rodríguez
Photographs
Sanhipolito
Builder
Passivhausbau, S.L.
Energy Reference Surface
83 m²
Construction cost (excluding VAT)
€ 115,000 (€ 1,093 / built m²)
Energy certifications
None