BMV house

Energy data

Heating 50

kWh/(m²year)

Heating demand

Amount of heat that must be supplied throughout the year to ensure the comfort conditions established by the regulations

Cooling 50

kWh/(m²year)

Dehumidification and cooling demand

Amount of heat that must be extracted throughout the year to ensure the comfort conditions established by the regulations

Airtightness 10

1/hour

Thermal envelope airtightness

Number of indoor air changes that occur every hour, under an indoor-outdoor pressure difference of 50 Pascals

Energy 200

kWh/(m²year)

Non-renewable Primary Energy (EP) demand

Nuclear or from fossil fuels (oil, natural gas and coal, fundamentally)

Saving 0

€/year

Estimated annual heating, cooling, and dehumidification savings

Comparing with an identical building that complies with the Spanish Technical Building Code (CTE-2013), with half the performance of its equipment and an energy price of €0.40/kWh

Construction year

2021

Location

Becerril de la Sierra, Madrid. SPAIN

Architects

Fernando Sanhipolito

Collaborators

Alba Sánchez / Isaura Rodríguez

Photographs

Sanhipolito

Builder

Passivhausbau, S.L.

Energy Reference Surface

83 m²

Construction cost (excluding VAT)

€ 115,000 (€ 1,093 / built m²)

Energy certifications

None

Construction process